Project Manager Level 2 at Amatola Water

Company:

Amatola Water

Amatola Water

Industry: General

Deadline: Not specified

Job Type: Full Time

Qualification: Bachelors, Higher National Certificate, National Certificate

Experience: 8 years

Province: Eastern Cape

City: East London

Field: Project Management

Minimum Qualifications:

  • BSc / B Tech Civil Engineering (NQF 7)

Preferred Qualifications:

  • National Diploma (NQF Level 6) , a Degree (NQF Level 7 ) or a post graduate Diploma in Project Management.

Professional Registration

  • Professionally Registered with ECSA or SACPCMP , PMSA or PMI

Minimum Experience:

  • Minimum 8 years’ experience in the Infrastructure Environment
  • 8 years’ Project Management experience with a proven track record in managing high level projects, project management skills (best project management practices) in terms of managing matrix structures, multi-disciplinary and multi projects.
  • Experience in water infrastructure environment, will be an added advantage.

Key Outputs:
Reporting to the Senior Manager Special Programmes, the employee will:

  • Manage the approval process of the project charter and contract
  • Develop tender document specifications
  • Liaise with Supply Chain Management (SCM) with regard to the publication of tender documents
  • Initiate and Manage Feasibility studies to ensure high accuracy and transparency during the adjudication of the results
  • Co-ordinate project needs with the Infrastructure Development Plan
  • Initiate and monitor GIS inputs for all feasibility studies
  • Costing and budgeting of projects to ensure that adequate funding is available for construction
  • Study feasibility reports carefully and make detailed recommendations regarding accuracy and quality of work done by consultants
  • Prepare internal costing of projects
  • Project manage all construction phases of the project to ensure that construction is correct and to specification are and to ensure that corrections can be made timeously
  • Study the project stages in detail to ensure a good understanding of the critical construction issues
  • Confirm that construction is in line with the initial goal of the project
  • Prepare a quality control plan
  • Attend all technical and progress meetings
  • Manage consultant activity
  • Prepare regular progress reports for the CEO and Department of Water and Sanitation
  • Environmental Impact Assessment (EIA) to ensure that Amatola Water’s projects adhere to the regulations of the relevant Acts
  • Identify projects and actions, which may damage the environment
  • Know and understand the National Environmental Management Act
  • Confirm that projects conform to the environmental legislation
  • Management to ensure that resources are used according to maximum potential
  • Management of technical staff per project basis
  • Co-ordinate projects with other role-players
  • Check staff timesheets for accuracy

Method of Application
Submit your CV and Application on Company Website:

Civil Design Engineer at Amatola Water

Internal Audit Manager at Forvis Mazars Group